Marple Locks, the pound between locks 6 & 7

With an average rise of 13 feet 0¾ inch, Marple locks are among the deepest on the narrow canal system in Britain. As a result, it was understood at the planning stage that methods of providing adequate water supply and storage were required. On average, each lock of the Marple flight consumes around 42,700 gallons of water every time a boat passes through and because of this it was evident that this was of vital importance.

The locks were relatively close together and as a consequence the pounds were too short to function as reservoirs. This obstacle was overcome by making the pounds much wider than was required for navigation purposes in order to increase their water storage capacity. This widening is most noticeable towards the top of the flight between locks 13 and 16, which were constructed wider on the east side. The two pounds between locks 13 and 15 were bulbous shaped while the pound between locks 15 and 16 was long and narrow in the shape of a sickle. The by-wash around lock 16 was channelled into the head of this.

Referring to the Tithe Map showing the pound between locks 6 and 7, it can be seen that it was locally widened at its southern end in order to increase its capacity. This was also constructed on the east side but in this instance the towpath was on the same side. The disadvantage of this arrangement was that while a boat was steering across the wide, the towing horse had to walk around its perimeter.

The Ordnance Survey map of c1875 shows that at some point during the intervening 25 years that the towpath had been diverted across the wide to leave an isolated pond that remains to the present day. An examination of this pond shows that no slippage of the ground seems to have occurred, so the rationale behind the diversion seems to have been one of improving efficiency.

 

A view looking across the pond, 2 March 2008.

The bridge across the tail of lock 7 is visible in the background.
A view of the original towpath curving round to the right, 2 March 2008.

The pond is off the picture on the right and the embankment supporting it is on the left.
A section of the retaining wall at the foot of the embankment, 2 March 2008. Detail of the embankment with the retaining wall in the foreground, 2 March 2008.

This view illustrates just how high the embankment had to be built in order to bring the land up to the level of the canal.